single-jc.php

JACIII Vol.4 No.4 pp. 263-267
doi: 10.20965/jaciii.2000.p0263
(2000)

Paper:

Approach to Scheduling Problem Solution in Production Systems Using the Multiagent System

Frankoviè, B., Labátová S. and Budinská, I.

Institute of Control Theory and Robotics
Slovak Academy of Sciences, Dúbravská cesta 9 Bratislava, SR

Received:
May 12, 2000
Accepted:
July 20, 2000
Published:
July 20, 2000
Keywords:
Production system, Scheduling, Optimization, Multi agent systems
Abstract
This paper considers job-shop-scheduling problem in multimachine multipart manufacturing systems. The purpose of the article is to contribute to the decision on scheduling rules for job-shop problems. The paper also describes the possibility of utilization of MAS formalism to represent different parts of the production systems and their mutual relations. The interrelations in the multiagent world are examined.
Cite this article as:
Frankoviè, B., Labátová S., Budinská, and I., “Approach to Scheduling Problem Solution in Production Systems Using the Multiagent System,” J. Adv. Comput. Intell. Intell. Inform., Vol.4 No.4, pp. 263-267, 2000.
Data files:

*This site is desgined based on HTML5 and CSS3 for modern browsers, e.g. Chrome, Firefox, Safari, Edge, Opera.

Last updated on Oct. 01, 2024