single-dr.php

JDR Vol.12 No.4 pp. 733-740
(2017)
doi: 10.20965/jdr.2017.p0733

Paper:

District Continuity Plans for Large-Scale Disaster Coordination: Case Study in Kagawa District

Chikako Isouchi

Institute of Education, Research and Regional Cooperation for Crisis Management Shikoku (IECMS), Kagawa University
1-1 Saiwai-cho, Takamatsu 760-8521, Japan

Corresponding author

Received:
January 20, 2017
Accepted:
April 13, 2017
Online released:
July 28, 2017
Published:
August 1, 2017
Keywords:
business continuity plan (BCP), district continuity plan (DCP), community disaster management plan (CDMP)
Abstract

To deal with large-scale disasters, it is necessary to maintain important community functions. One way to achieve this goal is through strategic collaboration with local organizations to ensure district continuity in the aftermath of disaster. It is therefore necessary for local organizations to form a consensus in order to draft measures for the reduction of disaster damage, enabling each organization to act strategically in a post-disaster situation. These measures taken together are called a district continuity plan (DCP).

In this paper, the concept of district continuity is defined as a BCP method. The utility of this method is clarified through two case studies. The Kagawa DCP focuses on a possible future Nankai Trough earthquake, and the Basin DCP against large-scale flooding is based on the DCP concept.

Cite this article as:
C. Isouchi, “District Continuity Plans for Large-Scale Disaster Coordination: Case Study in Kagawa District,” J. Disaster Res., Vol.12 No.4, pp. 733-740, 2017.
Data files:
References
  1. [1] C. Isouchi, H. Aritomo, W. Shiraki, and H. Inomo, “The proposal and practice of the drafting of the Business Continuity Plan (BCP) for the construction industry to introduce district continuity management in disaster reduction measures and disaster recovery,” Procs. on Safety Problems Research, Vol.5, Committee of Safety Problems, Japan Society of Civil Engineers, pp. 13-18, November 2010 (in Japanese with English abstract).
  2. [2] C. Isouchi, K. Mano, W. Shiraki, and H. Inomo, “The proposal to improve district continuity by supporting the drafting of the Business Continuity Plan (BCP) in construction industry,” Procs. of the Japan Society of Civil Engineers F6 (safety issues), Japan Society of Civil Engineers, Vol.67, No.2, pp. I59-I64, 2011 (in Japanese with English abstract).
  3. [3] Crisis & Security Management Research Centre, Kagawa University, Kagawa District Continuity Council, http://www.kagawa-u.ac.jp/csmrc/ccckr/ [in Japanese, accessed on July 18, 2014]
  4. [4] Council for Strategic Policies for Shikoku East Nankai/Nankai Earthquakes, “The basic strategy of disaster prevention in Shikoku,” 2011 (in Japanese).
  5. [5] Crisis & Security Management Research Centre, Kagawa University, Kagawa District Continuity Council, http://www.kagawa-u.ac.jp/csmrc/ccckr/ [in Japanese, accessed on July 18, 2014]
  6. [6] C. Isouchi, C. Shiraki, H. Iwahara, H. Inomo, and R. Takahashi, “Social tolerant limits against dysfunctionality of the local area at the time of a large-scale disaster and guidelines for drafting the District Continuity Plan,” Procs. of the Japan Society of Civil Engineers F6 (safety issues). Japan Society of Civil Engineers, Vol.69, No.2, pp. I_31-I_36, 2013 (in Japanese with English abstract).
  7. [7] M. Nishizawa, and S. Tsutsui, “Introduction to Community disaster Prevention Planning System: The Cabinet Office’s ‘Community disaster prevention guidelines’ and Q&A,” Figures on p.206, NTT Publication, 2014 (in Japanese).
  8. [8] T. Sasida, S. Nishikawa, and H. Maruya, “The Review of the DCP concept and proposal for a new municipality district continuation plan (MCP),” Procs. of the Institute of Social Safety Science, No.33, November 2013 (in Japanese).
  9. [9] S. Mori and M. Mizuguchi, “The promotion of the District Continuity Plan: community disaster prevention in an urban office block,” Procs. and Reports from the Symposium on Underground Space, edited by the Underground Space Research Committee, the Japan Society of Civil Engineers, Japan Society of Civil Engineers, pp. 181-185,1995 (in Japanese with English abstract).
  10. [10] S. Nishikawa, S. Beniya, S. Nagamatsu, and M. Nonaka, “Community disaster prevention activities by companies towards the realisation of the DCP in the business and commercial district,” Procs. of the Institute of Social Safety Science, No.21, pp. 101-104, November 2007 (in Japanese).
  11. [11] The Cabinet Office, 2013 Disaster Prevention White Paper.
  12. [12] H. Maruya, “The Business Continuity Plan (BCP) and the disaster prevention plan: a discussion of the relationship with the DCP,” PRI Review, No.49, pp. 102-119, Summer 2013 (in Japanese).
  13. [13] T. Sashida, “The Katrina disaster and business continuity,” Procs. of the Institute of Social Safety Science, No.18, pp. 53-56, May 2006 (in Japanese).
  14. [14] S. Mori, “The managerial possibility of the District Continuity Plan (DCP) in regards to the construction of the secondary communication network at the time of disaster,” Proceedings of the Institute of Social Safety Science, No.26, pp. 91-97, November 2010 (in Japanese).
  15. [15] C. Isouchi, W. Shiraki, and H. Inomo, “The current situation of business continuity planning by companies in Kagawa Prefecture with a view to the Great East Japan Earthquake and future challenges,” Procs. of the Japan Society of Civil Engineers F6 (safety issues), Japan Society of Civil Engineers, Vol.68, No.2, pp. I_52-I57, 2012 (in Japanese with English abstract).
  16. [16] C. Isouchi, R. Takahashi, H. Iwahara, and W. Shiraki, “The Business Continuity Plan (BCP) and District Continuity Plan (DCP) in order to prepare for Nankai Trough,” Abstracts of the nineteenth technology research presentations, Shikoku Branch, Japan Society of Civil Engineers, pp. 257-258, 2013 (in Japanese).
  17. [17] R. Takahashi, C. Isouchi, H. Iwahara, and W. Shiraki, “The development of a district impact analysis system for the drafting of the district continuity plan,” Abstracts of the nine-teenth technology research presentations, Shikoku Branch, Japan Society of Civil Engineers, pp. 213-214, 2013 (in Japanese).
  18. [18] C. Isouchi and M. Kouhei, “(2011) A Proposal for District Continuity Intensification by Drawing up and Supporting a Business Continuity Plan (BCP) for Construction Companies: A New Way of District Development,” J. of JSCE, Vol.1, No.1, pp. 353-359, 2013.
  19. [19] S. E. N. a. N. E. C. S. Committee, “Shikoku Earthquake Prevention Basic Strategy, 2011 (in Japanese).
  20. [20] K. U. K. D. C. I. C. Crisis and Security Management Research Center (at that time), Institute of Education, Research and Regional Cooperation for Crisis Management Shikoku (Current) (in Japanese).
  21. [21] W. Shiraki, C. Isouchi, and H. Inomo, “Measures and Challenges of Business Continuity Plan (BCP) Companies in Kagawa Prefecture Based on Instruction of the Eastern Japan Great Earthquake,” J. of Japan Society of Civil Engineers, Ser.F6 (Safety Problem), Vol.68, No.2, pp. I_ 52-I_57, 2012 (in Japanese with English abstract).
  22. [22] C. Isouchi, R. Takahashi, T. Ishihara, and W. Shiraki, “Business Continuity Plan (BCP) and District Continuity Plan (DCP) in the preparation for Nankai trough,” Japan Society of Civil Engineers, Shikoku Branch, 2013 (in Japanese)
  23. [23] Y. Kishi, “How to draw a “basin map”: Thinking about the Earth from the river,” Chikuma Prima Shinsho, 2013 (in Japanese).
  24. [24] River and Road Management Office, Shikoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism, “The development plan of the River Doki system: Development of River Doki (in the state’s jurisdiction),” September 2012 (in Japanese).
  25. [25] River and Road Management Office, Shikoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism, “Examination of the measures appropriate to large-scale flooding of River Doki,” http://survey-kagawa.com/top.html [in Japanese, accessed July 18, 2014]
  26. [26] Commission on the development of social capital, “Responses to climate change caused by global warming in the area of flooding disaster (report),” June 2008 (in Japanese).
  27. [27] T. Yamamoto, C. Isouchi, H. Iwahara, W. Shiraki, R. Takahashi, T. Sawada, E. Sato, and T. Shirakawa, “A discussion of the hosting and managing a wide-area workshop for countermeasures against large-scale flooding disasters: the case study of River Doki, Kagawa Prefecture,” The 69th Annual Academic Lecture of the Japan Society of Civil Engineering (submitted on July 18, 2014) (in Japanese with English abstract).
  28. [28] S. Mori, M. Nishizawa, S. Tsutsui, and S. Kim, “A discussion of the establishment of the community disaster prevention planning system following the Great East Japan Earthquake: in reference to the revision to the Disaster Countermeasures Basic Act and the Cabinet Office’s survey on support through mutual assistance,” Procs. of the Institute of Social Safety Science, pp. 35-40, May 2014 (in Japanese).
  29. [29] Y. Inoue, M. Nishizawa, and S. Tsutsui, “The significance of legal system design in regards to ‘mutual assistance’ following the Great East Japan Earthquake: on the revised Disaster Countermeasures Basic Act and the community disaster prevention planning system,” Procs. in Law, Fukuoka University, Vol.59, No.1 (off-print), June 2014 (in Japanese).

*This site is desgined based on HTML5 and CSS3 for modern browsers, e.g. Chrome, Firefox, Safari, Edge, Opera.

Last updated on Apr. 22, 2024